Dock box
Dock System

PIT-FRAME Prefabricated Dock Pit Frame

A factory-prepared steel frame that translates the approved dock-leveler pit drawing into a cleaner civil-work interface.

PIT-FRAME Prefabricated Dock Pit Frame
A factory-prepared steel frame that translates the approved dock-leveler pit drawing into a cleaner civil-work interface.
Primary keyword: prefabricated dock leveler pit frame Category: DOCK SYSTEM
Best-fit applications
• New warehouse construction • Repeat loading-bay projects • Sites controlling civil-work tolerances
Why this configuration
Faster coordination
The frame gives the civil contractor a defined steel interface for the dock-leveler pit.
Consistent geometry
Factory preparation helps repeat the approved opening size across multiple bays.
Reduced interface risk
Embedded angles, conduit positions and front-edge details can be coordinated before concrete work.
Built from the final drawing
Frame dimensions follow the selected platform, pit depth and building detail rather than a generic size.
Technical specifications
Item: Current information Fabrication basis: Approved dock-leveler pit drawing Typical embedded angle: 80 x 80 x 6 mm shown in current guide Typical recessed channel: 20 mm shown in current guide Conduits: Main and spare conduit positions coordinated Pit sizes: Matched to the selected leveler Finish: Confirmed for project environment Selection boundary: The frame does not replace structural design or site surveying. Final dimensions must match the approved platform and the engineer's civil drawing.
Certification and patent documentation
• ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 management-system documents supplied by GEAJIE. • CE documentation supplied for the DL-H Dock Leveler; applicability to this product must be confirmed for the final project. • Gallery space is reserved for 16 patent certificate images before public publication.
Send these project inputs
• Selected leveler model • Pit width, length and depth • Concrete sequence • Conduit route • Front-edge and bumper detail • Corrosion protection
Request a project review
Email: ivywong@tsunmi.com: mailto:ivywong@tsunmi.com?subject=PIT-FRAME%20Prefabricated%20Dock%20Pit%20Frame%20project%20review WhatsApp: Discuss this project: https://wa.me/8615921487118

GEAJIE product system

Explore More GEAJIE Products

Explore industrial doors, loading platforms, dock shelters and related equipment. Select compatible products around the site layout, operating environment and daily workflow.

dock levelers
Dock System

Hydraulic Dock Leveler

GEAJIE hydraulic dock levelers help connect the warehouse floor and truck bed for safer, smoother loading and unloading. Custom sizes, load capacities, open hinge design, lip plate, toe guard plate, bumpers, and hydraulic system options are available.

View solution