A factory-prepared steel frame that translates the approved dock-leveler pit drawing into a cleaner civil-work interface.

PIT-FRAME Prefabricated Dock Pit Frame
A factory-prepared steel frame that translates the approved dock-leveler pit drawing into a cleaner civil-work interface.
Primary keyword: prefabricated dock leveler pit frame Category: DOCK SYSTEM
Best-fit applications
• New warehouse construction • Repeat loading-bay projects • Sites controlling civil-work tolerances
Why this configuration
Faster coordination
The frame gives the civil contractor a defined steel interface for the dock-leveler pit.
Consistent geometry
Factory preparation helps repeat the approved opening size across multiple bays.
Reduced interface risk
Embedded angles, conduit positions and front-edge details can be coordinated before concrete work.
Built from the final drawing
Frame dimensions follow the selected platform, pit depth and building detail rather than a generic size.
Technical specifications
Item: Current information Fabrication basis: Approved dock-leveler pit drawing Typical embedded angle: 80 x 80 x 6 mm shown in current guide Typical recessed channel: 20 mm shown in current guide Conduits: Main and spare conduit positions coordinated Pit sizes: Matched to the selected leveler Finish: Confirmed for project environment Selection boundary: The frame does not replace structural design or site surveying. Final dimensions must match the approved platform and the engineer's civil drawing.
Certification and patent documentation
• ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 management-system documents supplied by GEAJIE. • CE documentation supplied for the DL-H Dock Leveler; applicability to this product must be confirmed for the final project. • Gallery space is reserved for 16 patent certificate images before public publication.
Send these project inputs
• Selected leveler model • Pit width, length and depth • Concrete sequence • Conduit route • Front-edge and bumper detail • Corrosion protection