aluminum loading platform
Dock System

EOD Edge-of-Dock Leveler

A compact dock-face leveler for retrofit projects where a full pit is unnecessary and the vehicle-height range is controlled.

EOD Edge-of-Dock Leveler
A compact dock-face leveler for retrofit projects where a full pit is unnecessary and the vehicle-height range is controlled.
Primary keyword: edge of dock leveler retrofit solution Category: DOCK SYSTEM
Best-fit applications
• Existing dock retrofits • Space-limited bays • Consistent trailer fleets
Why this configuration
Retrofit-focused
Designed for existing docks with a suitable dock face and basic prepared foundation.
Compact installation
The system uses less pit space than a conventional pit-mounted leveler.
Operating choice
The current catalogue lists both mechanical and hydraulic operating modes.
Durable construction
Galvanized steel or aluminum-alloy configurations can be reviewed for the application.
Technical specifications
Item: Current information Installation: Dock-face / edge mounting Operation: Mechanical or hydraulic option Foundation: Existing dock face must be structurally reviewed Vehicle range: Best for a controlled bed-height range Capacity and width: Confirmed for the project Material option: Galvanized steel or aluminum alloy, subject to proposal Selection boundary: An edge-of-dock leveler has a more limited working range than a full pit leveler. It should only be selected after the lowest and highest trailer beds are checked.
Certification and patent documentation
• ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 management-system documents supplied by GEAJIE. • CE documentation supplied for the DL-H Dock Leveler; applicability to this product must be confirmed for the final project. • Gallery space is reserved for 16 patent certificate images before public publication.
Send these project inputs
• Dock-face structure • Dock-to-trailer height difference • Bumper projection • Vehicle bed-height range • Load and wheel pattern • Available approach space
Request a project review
Email: ivywong@tsunmi.com: mailto:ivywong@tsunmi.com?subject=EOD%20Edge-of-Dock%20Leveler%20project%20review WhatsApp: Discuss this project: https://wa.me/8615921487118