
Dock System
EOD Edge-of-Dock Leveler
A compact dock-face leveler for retrofit projects where a full pit is unnecessary and the vehicle-height range is controlled.
EOD Edge-of-Dock Leveler
A compact dock-face leveler for retrofit projects where a full pit is unnecessary and the vehicle-height range is controlled.
Primary keyword: edge of dock leveler retrofit solution
Category: DOCK SYSTEM
Best-fit applications
• Existing dock retrofits
• Space-limited bays
• Consistent trailer fleets
Why this configuration
Retrofit-focused
Designed for existing docks with a suitable dock face and basic prepared foundation.
Compact installation
The system uses less pit space than a conventional pit-mounted leveler.
Operating choice
The current catalogue lists both mechanical and hydraulic operating modes.
Durable construction
Galvanized steel or aluminum-alloy configurations can be reviewed for the application.
Technical specifications
Item: Current information
Installation: Dock-face / edge mounting
Operation: Mechanical or hydraulic option
Foundation: Existing dock face must be structurally reviewed
Vehicle range: Best for a controlled bed-height range
Capacity and width: Confirmed for the project
Material option: Galvanized steel or aluminum alloy, subject to proposal
Selection boundary: An edge-of-dock leveler has a more limited working range than a full pit leveler. It should only be selected after the lowest and highest trailer beds are checked.
Certification and patent documentation
• ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 management-system documents supplied by GEAJIE.
• CE documentation supplied for the DL-H Dock Leveler; applicability to this product must be confirmed for the final project.
• Gallery space is reserved for 16 patent certificate images before public publication.
Send these project inputs
• Dock-face structure
• Dock-to-trailer height difference
• Bumper projection
• Vehicle bed-height range
• Load and wheel pattern
• Available approach space
Request a project review
Email: ivywong@tsunmi.com: mailto:ivywong@tsunmi.com?subject=EOD%20Edge-of-Dock%20Leveler%20project%20review
WhatsApp: Discuss this project: https://wa.me/8615921487118
